Projects

Engineering Learning Hub

Written by DCWC Team | May 5, 2017 1:07:37 AM

Stage One – Engineering Structures Learning Laboratory
Stage Two – Building H1a and Building H2
Upon completion of the building, there was a phased approach to move into the new facility as fitout of some components of the building were to occurring post-practical completion.
Key project elements include:

  • Enabling students to receive instruction and practical experience in structural engineering and testing
  • Dedicated areas for postgraduate students and 120 capacity flexi-laboratory spaces
  • New three and four storey structures covering 6,500m²
  • World-class visualisation theatres for immersive learning
  • Modern and attractive learning and collaborative spaces